During a plant modification project, a nuclear utility required modifications to the turbine deck manway, platform, and stairs. The replacement components needed to be fabricated in support of a compressed outage schedule.
Replacement turbine deck components fabricated from carbon structural steel, including the manway, platform, and stairs, manufactured to support the plant modification.
Master Machine completed the carbon structural steel fabrication of the replacement turbine deck manway, platform, and stairs in support of the customer's plant modification. The project was successfully completed to meet the demands of the compressed outage schedule.
As part of an advanced reactor new plant construction project, a customer required the design and fabrication of multistage stainless steel steam orifice assemblies. The assemblies demanded high-precision manufacturing to support the requirements of new plant construction.
High-tolerance machined and fabricated multistage stainless steel steam orifice assemblies requiring controlled welding and non-destructive examination.
Master Machine completed the design and fabrication of the multistage stainless steel steam orifice assemblies, including the high-tolerance machining, controlled welding, and non-destructive examination required to meet the project's specifications in support of advanced reactor new plant construction.
Following design changes resulting from the Fukushima accident, a nuclear utility required a plant modification to implement the necessary upgrades. The work needed to support outage requirements while meeting the rigorous standards for nuclear safety-related components.
Nuclear safety-related fabrication of a nuclear check valve assembly and 109 associated pipe weldments, requiring controlled welding and non-destructive examination (NDE).
Master Machine completed the nuclear safety-related fabrication of the nuclear check valve assembly and 109 associated pipe weldments, including the controlled welding and non-destructive examination (NDE) required to support the outage requirements associated with the Fukushima modification project.